Start here when publishing an AOS release. Work through the sections in order. Use the same checklist for every registry; each destination's profile determines its additional checks, observation time, and approvals.

To publish only to the staging surface, without qualification, follow publishing to staging only below: it is the same procedure, stopped before production.

Keep a copy with this release's operator records, outside the source checkout. Check an item only after its Check when condition is true. Beside the box, record your name, UTC time, and the log, output directory, or approval showing the result. Leave failed or unfinished items unchecked. Do not proceed past a section with an unchecked required item.

Mark an item inapplicable only where this checklist explicitly permits it, and record the reason. Enable set -o noclobber in the operator shell before running the commands below so redirected evidence files cannot silently be replaced.

aos maintain release advance runs every automated step and stops at each human decision with one Waiting: instruction. Whenever an item names a journal state, run aos maintain release status and compare the line for the named destination (or the global State: line) with the expected value. The driver keeps every earlier journal under the work directory; later steps write successors.

Qualification readiness: packaged executors include native package and Linux disk/container staging scenarios, with dedicated recovery and K3s package scenarios. Install the exact platform closures and run them against the published staging artifacts. Required report-backed scenarios still need real campaign or operator evidence; do not substitute synthetic fleet reports. Follow the executor setup before treating the test environments as ready. Main remains closed until its launch requirements are satisfied.

The destinations and what each one requires:

RegistryDestinationProfileTests before publicationReviewsRolloutFitness
andyl/main, andyl/experimentalstaging/edgebuildbuild onlynoneall partitions on publishnone
andyl/main, andyl/experimentalproduction/edgesmokechanged targets and cellsnoneall partitions; completes automaticallynone
andyl/mainstaging/candidate, staging/stablebuildbuild onlynoneall partitions on publishnone
andyl/mainproduction/candidatefunctionalevery target and cell1 per reportall partitions after fresh health; completes automatically14-day automated, 90-day operator
andyl/mainproduction/stablesoakevery target and cell, complete matrix1 per report, including each ring; completion approvals4, 32, 128, 256 partitions; 7-day soak; complete-phase reportas candidate plus key rotation

These are the current contract values. A reviewed contract revision may change them; record the frozen plan's values, which aos maintain release explain prints.

Only a destination whose profile selects qualified claims (today production/stable, soak) needs a complete-phase report and the release-evidence completion approvals. Every other destination records complete automatically when its final ring's channel advance and public read-back succeed.

#Publishing to staging only

There is no separate staging-only plan. To place a release on the staging surface for operator testing without qualifying it, complete sections 1 to 3 and stop before section 4. The staging destinations' build profile needs no qualification, review, or fitness attestation; the build's repeat check, an advisory disposition with no unresolved advisories, the signed cache, manifest, and TUF metadata, and a full public read-back are still required. The frozen plan already names the production destinations, so the same release can continue to production later with its actual qualification evidence. For an empty staging registry, perform only the signed staging bootstrap.

#1. Prepare the release

Complete this section before starting builds or requesting signatures.

  • Record the release. Record the release version, registry, intended destinations, source commit, operator, and reviewer. Use a version whose class matches the intended channel: -dev.YYYYMMDD.N for edge on either registry, -rc.N for a main candidate, or a final YYYY.M.P for a main stable release. andyl/experimental accepts only edge versions.

    Check when: those fields are filled in and the registry/version combination is valid. A final version plans both candidate and stable destinations; an edge version plans both edge destinations.

  • Check the maintainer configuration. Open the maintainer configuration for this registry and the maintainer-machine configuration. Locate the configured signer programs, independently obtained public keys, surfaces, receipt keys, executors, reviewer key, and alert destination.

    Check when: registry names this release's registry, work_root and fitness_root are private directories outside the source checkout, every signer role in the approved roster has a [signer.roles.<role>] table whose key IDs, verification identities, threshold, and provider revision match that roster, [git] names the organization's public release identity for registry commits, and the shell runs the installed release tooling closure. One configuration serves one registry; load only its credentials.

  • Verify source and contributor authorization. Use the protected source commit intended for release, not a working PR branch. Run git status --porcelain and git rev-parse HEAD. Complete the contributor-authorization check and confirm its public summary is the file named by contributor_authorization.

    Check when: Git reports no changes, the commit matches the release record, and authorization is verified. An emergency hotfix source follows the hotfix rule. Missing or unknown authorization stops the release.

  • Confirm the test environments are ready. Confirm real test programs exist for both Linux disk/container targets and every platform receiving packages, including native macOS runners where needed, inside the installed release tooling closure's libexec/aos-release/executors/<platform>/.

    Check when: every required test has an implementation and each executor's identity file names the identity it reports. A generic runner, empty scenario mapping, or passing fixture test does not satisfy this item. Complete the executor setup described above.

  • Verify the registry and both surfaces. Follow the preconditions and live-state commands in the experimental or main runbook. For each surface, confirm its identity: the Hub deployment ID, or the .aos-surface identity of a static surface. Record the registry base commit/generation and trust-root epoch.

    Check when: both surfaces identify the intended builds and registry, and the configuration's [surfaces.staging] and [surfaces.production] identities equal what the surfaces serve. Existing registries need a verified base; first-time bootstrap needs a recorded authoring base and verified empty destinations. Main requires its recorded go-live approval.

  • Check environment fitness. Run:

    aos maintain release fitness status
    

    Check when: every fitness kind required by this release's production destinations is fresh and its bindings match the live values. For andyl/experimental releases, record that no fitness is required. A stale or mismatched attestation is not a per-release task to rush: perform the corresponding fitness exercise on its own procedure before production publication, or schedule this release after it.

#2. Freeze what will be released

  • Record the support matrix and acceptance criteria. Use the target support matrix. List the required QEMU and OCI configurations, every published package/platform cell, and additional physical, cloud or device claims. For each claim, record its compatibility scope, required assurance, release-blocking status, assigned configurations and evidence location. Record QEMU acceleration separately; identify CPU/device combinations and cloud provider/SKUs explicitly. Use the acceptance checks to define each test program's expected results.

    Check when: all four mandatory reference configurations have assigned tests at the assurance their destinations select (A2 for smoke and functional, A3 for soak), additional claims have explicit assurance obligations, and CPU, firmware, device and enabled-driver coverage has been reviewed. Broad compatibility assessments and directly tested configurations must be recorded separately. Additional A3 image/container claims need target cases before the plan is frozen.

  • Prepare the predecessor. Confirm the configuration's predecessor_bundle is the verified signed bundle of the preceding release in this registry, with its public verification keys. The first public release needs a retained signed test snapshot as its predecessor; an empty registry base is not an installed OS to upgrade from. When no prior release exists, follow the restricted qualification snapshot workflow before freezing the public plan.

    Check when: the predecessor bundle verifies offline against independently obtained keys and names this registry.

  • Prepare an emergency override, if needed. Mark this item inapplicable unless an incident requires production/stable to soak or roll out faster than its profile. Otherwise record the incident, prepare the profile override for this release ID and production/stable, and obtain the release-evidence threshold of signatures over it.

    Check when: the override names the incident record, relaxes only soak (not below one day) and rings (ending at 256), and every signature verifies. An emergency does not waive any other check in this list.

  • Confirm downstream toolchain coverage. From the clean source checkout, run:

    nix-build -A checks.downstream.toolchain-release --no-out-link
    

    Check when: the check passes, so every member of the downstream toolchain set is an eligible public package on both Linux platforms and enters the frozen package matrix. A failure stops the release until the toolchain set, the package's platform support, or the platform deferral is fixed in a reviewed change.

  • Freeze the plan. Write the reviewed Linux image decisions for this release to a JSON file, then from the clean source checkout run:

    aos maintain release new --registry andyl/experimental --version 2026.9.0-dev.20260929.1 --images images.json
    

    For a registry's first release, when no surface holds a publication yet, add --first-release --source-registry <clean single-commit clone> as described in plan a registry's first release. For an emergency, add --override DIR, or immediately run aos maintain release advance --to production/stable --override DIR before any other advance, as described in plan an emergency override.

    Check when: the command exits zero and the printed summary contains the intended source, registry, version, predecessor, both surfaces, every destination with its profile, the change scope, target decisions, and authorities. Save the reported plan digest and keep this checklist in the release's work directory from now on. If anything is wrong, fix the configuration or source and start a new release; do not edit the frozen plan.

  • Bootstrap a first registry base, if needed. For an existing verified base, record its receipt and mark this item inapplicable. For a plan frozen with --first-release, obtain the separate staging and production bootstrap approvals for this plan. Run release bootstrap on the staging surface first with --output <work>/bootstrap/staging, verify its result, then repeat for production with that surface's approval and access profile and --output <work>/bootstrap/production.

    Check when: both bootstrap outputs are retained in the work directory, their public read-back succeeded, and their base commit and surface identities match the plan. Do not bootstrap over an existing publication.

#3. Publish to staging

Run the driver for the first staging destination of this release:

aos maintain release advance --to staging/edge        # edge release on either registry
aos maintain release advance --to staging/candidate   # andyl/main candidate or final

It builds, signs, closes, verifies, and publishes the release, then moves the staging channel. Rerun the same command after each Waiting: step. The driver waits for these operator inputs, each at a fixed path in the release's work directory:

InputPathWhen
Externally signed OCI release bundle: container-release.json, signature-input.json, layout/inputs/container/After image finalization, when the release carries an OCI artifact
Clean authoring registry clone at the planned base commitinputs/source-registry/Before prepare-registry
Acceptance of the reviewed registry transaction--accept-transaction, recorded as registry/transaction-accepted.jsonAfter prepare-registry, when a planned profile requires transaction review
Reviewed advisory disposition for build/evidence/sbom.spdx.jsoninputs/advisory-disposition.jsonAfter the cache is signed, before assembly

For a final andyl/main version, repeat with --to staging/stable once staging/candidate is published; the surface already holds the publication, so only the channel moves.

  • Build and repeat-build the frozen outputs. Let the driver run release build. Run the source regression suite as well:

    nix-build -A checks.qualification.all --no-out-link
    

    Check when: both exit zero, every planned output appears in the build report with reproducibility: "reproduced", and aos maintain release status reports State: built. Save the Nix result path and logs.

  • Finalize both Linux images and the OCI artifacts. The driver runs finalize-image for each planned Linux assembly into images/<platform>/<variant>/. When it waits for the OCI sidecar, follow the registry runbook's external container signing and immutable graph upload procedure and place the result in inputs/container/. When it waits for the authoring registry, place a clean clone at the planned base commit in inputs/source-registry/.

    Check when: both images have finalized/ outputs and finalized-image-set.json, all requested disk formats passed byte-equivalence verification, and the signed OCI release/layout covers both Linux platforms. The authorities must belong to this release. Unsigned outputs and fixture keys do not satisfy this item.

  • Review the isolated registry transaction. Mark inapplicable for andyl/experimental, whose smoke profile does not stop here. For andyl/main the driver waits after prepare-registry. Review registry/transaction.json and the retained tree in registry/prepared/ together, then run aos maintain release advance --to staging/candidate --accept-transaction.

    Check when: the transaction identifies exactly the planned package/platform outputs, the retained diff matches it, and the driver has finalized the registry and cache from those exact inputs with verifying narinfo signatures.

  • Review build evidence and close the bundle. When the driver waits for the advisory disposition, prepare the canonical disposition described in close and sign the bundle at inputs/advisory-disposition.json. Review the assembled payload and unsigned manifest before the driver requests signatures.

    Check when: required build observations passed, every advisory has a disposition with no unresolved release blocker, and aos maintain release status reports State: finalized.

  • Verify the bundle independently. Run release verify on finalized/bundle/ with finalized/release-journal.jsonl and public keys obtained independently of the bundle and of the maintainer configuration.

    Check when: verification exits zero and names this release and the finalized journal state. Save the output. Missing files, wrong signatures, and mismatched digests stop the release.

  • Confirm the staging publication. The driver publishes with staging-only credentials, reads every object back anonymously, and advances the staging channel's single ring.

    Check when: publish/staging-<channel>/published/receipt.json exists and aos maintain release status reports the staging destination complete. This checks delivery; functional testing comes next. Repeat for staging/stable when planned.

  • Download the downstream toolchains from staging. Run toolchain-cache-check with --realise and a fresh --store, using only the staging surface's cache and its cache public key.

    Check when: the command exits zero for both Linux platforms. A derivation that would be built locally means the staging cache lacks part of a toolchain closure; stop the release.

#4. Publish to production

Complete the subsection for each production destination the plan contains. Switch to production-only access before the driver's production publication step. Every production destination repeats the same pattern: collect staging-phase evidence against the staging surface, review where required, publish, and advance rings. production/edge and production/candidate complete with their final ring; only production/stable adds a complete-phase report and completion approvals.

#4a. production/edge (smoke) on andyl/main or andyl/experimental

  • Confirm the change scope. Run aos maintain release explain --to production/edge.

    Check when: the change scope names the expected predecessor and its image, container, and package decisions match the source changes. An unexpectedly narrow scope stops the release; a missing predecessor correctly selects every target.

  • Run the functional tests. Run aos maintain release advance --to production/edge. The driver runs qualify-run for the staging phase and signs the report with the qualification authority.

    Check when: every case listed by explain has a passing result in the signed report with retained logs, including installation, packages, update, and recovery cases selected by the scope. Missing or failed results stop the release.

  • Test physical-hardware claims. If no A2 physical or device claim is made, record that scope and mark this item inapplicable. Otherwise execute the claimed functions on the exact published candidate and retain CPU SKU, chipset/SoC, firmware, device IDs, bound drivers, storage durability settings and TPM state.

    Check when: every directly tested configuration passes the checks for its claimed functions. Record untested combinations separately.

  • Publish and roll out. The driver constructs the destination's TUF metadata and timestamp, publishes the exact bundle to the production surface, reads it back, and advances all 256 partitions. The final ring completes the destination; smoke needs no completion approval. For OCI, finish the registry runbook's release-tag publication against the published signed sidecar.

    Check when: publish/production-edge/published/receipt.json and channels/production-edge/ring-1/channel-receipt.json exist, and aos maintain release status reports production/edge complete. Then complete the clean-client, profile, and warning checks in the experimental runbook; they apply unchanged to a main edge release, whose artifacts also bake an edge warning.

#4b. andyl/main: production/candidate (functional)

  • Assign every required test. Run aos maintain release explain --to production/candidate.

    Check when: every listed case has an assigned program/environment or operator. explain shows cases as not yet evaluated: this box means the work is assigned, not that it passed. An unavailable environment does not make a case optional. Compare the cases with the support matrix: every mandatory configuration and additional claim must be covered, with the required cycle counts and package checks.

  • Test physical-hardware claims. As in 4a. If no physical or device claim is made, mark this item inapplicable.

  • Collect the staging report. Run aos maintain release advance --to production/candidate. The driver collects the staging-phase report against the staging surface and waits for review.

    Check when: every case has a passing result in the prepared report with retained logs. Inspect evidence for installation/provisioning, packages, configuration, HTTP/TLS, containers, reboot persistence, upgrade, interrupted update, fallback, rollback, offline recovery, and another successful update, as required by each case. Inspect committed-data checks and failed attempts too. Update achieved assurance in the matrix from those results. Any unmet release-blocking assurance obligation stops the release.

  • Review and sign the exact report. The independent reviewer runs aos maintain release review against the prepared report, following collect, review, and sign.

    Check when: the reviewer approved these exact report bytes and the driver's next run signs them with the qualification authority. Changing a report requires another review.

  • Confirm fitness and publish. Run aos maintain release explain --to production/candidate, then rerun advance.

    Check when: every required fitness attestation is fresh and binding-matched, the driver published the exact bundle with the public release record, and aos maintain release status reports production/candidate published. For OCI, finish the registry runbook's release-tag publication.

  • Approve rollout health. The driver collects a fresh rollout-phase report for the single ring and waits for review. Review it with aos maintain release review within ten minutes of collection.

    Check when: clean clients consume the intended artifacts, no integrity or recovery failure is unresolved, the ring's channel receipt exists, and aos maintain release status reports production/candidate complete. The functional profile completes with its single ring; it has no completion approval.

#4c. andyl/main: production/stable (soak)

Publish a final version to production/candidate first, following the monthly train in RFC-0017. The same bundle then enters production/stable.

  • Confirm the complete matrix and test assignment. Run aos maintain release explain --to production/stable.

    Check when: the plan has no blocked package/platform cell, and every listed staging, rollout, and complete case is assigned, including the A3 image and container observation claims.

  • Test physical-hardware claims. If no A2/A3 physical or device claim is made, record that scope and mark this item inapplicable. For A3 image-lifecycle claims, use disposable data to interrupt power during update and persistence, recover, verify acknowledged data, and update again. Redundant-storage claims also need disk replacement, boot from each ESP, rebuild, and unlock tests; other device claims need their own workload tests.

    Check when: A3 lifecycle claims have boot, recovery, data-preservation and workload results. Do not interrupt power or restore data on a live production system.

  • Collect, review, and publish. Run aos maintain release advance --to production/stable, review the staging report with aos maintain release review, and rerun advance.

    Check when: the report passed review, fitness including key-rotation is fresh, and aos maintain release status reports production/stable published.

  • Start workload observation. Start the configured workload monitor on the exact production artifacts. Record machines/runtime, artifact digests, UTC start, workload, and the plan's soak for production/stable. Measure successful/failed operations, reboots, updates, recovery attempts, resource growth, and data integrity.

    Check when: the monitor is running and recording actual operations. A timer without a workload is not evidence.

Repeat the next two items for each ring, keeping separate results:

  • Approve the next ring. Run aos maintain release advance --to production/stable --ring N with the next ring number. The driver waits until the previous ring's observation time has elapsed, collects a fresh rollout report, and waits for review. Review it with aos maintain release review within ten minutes.

    Check when: the reviewer approved the health of the exact next partition range, the driver advanced only that ring, and a new channel receipt exists under channels/production-stable/ring-N/.

  • Check the clients reached by this ring. Inspect workload monitoring and clean-client package/image/container consumption.

    Check when: clients receive the intended release and no unexplained boot, trust, data-preservation, or recovery failure is present. Otherwise stop expansion and follow the failure procedure below.

  • Complete workload observation. Run the workload for the full soak. Review operation counts, failures, resource trends, and recovery/data checks with the release owner, then let the driver collect the complete-phase report and review it with aos maintain release review.

    Check when: measured elapsed time meets the soak, real operation counts are present, no blocking failure remains, and the complete-phase report is signed. Do not backdate results or use synthetic fixture timing as an observation report.

  • Approve completion. When the driver waits for completion approvals, each release-evidence approver signs the completion decision with aos maintain release review until the plan's threshold is reached. A completion decision cannot be rejected with --reject; withhold the approval and record the reason instead.

    Check when: every approval exists as channels/production-stable/completion-<key_id>.json, the driver ran channel complete, and aos maintain release status reports production/stable complete.

#5. Close the release

  • Verify retention and assign ongoing owners. Check retained release bytes, matching source, plans, journals, receipts, metadata, reports, and private operator records. Record retention deadlines, the monitoring/renewal owner, recovery contact, and published known limitations. Confirm the timestamp renewal timer is active for each production surface and its next run precedes expiry.

    Check when: retained objects can be read back, required backups are verified, and named maintainers have accepted renewal, monitoring, and recovery responsibilities. Main also needs its compatibility/support obligations recorded.

  • Download the downstream toolchains from production. For each production surface the release published, repeat the staging toolchain download with only that surface's cache and public key.

    Check when: the command exits zero for both Linux platforms on every production surface. Save its output with the release evidence.

  • Confirm every destination is complete. Run:

    aos maintain release status
    

    Check when: every planned destination reports complete. Save the output and completed checklist. This is the release's final check.

#Fitness exercises

These exercises prove the release environment can recover. They are not per-release steps. Each produces a signed fitness attestation that serves every release published while it is fresh and its bindings match. Record each in the maintainer's operations log, not in a release checklist.

KindPerformed byCadenceAccepted forInvalidated by a change to
storage-restoreaos-release-restore-check.timerweekly14 daysthe installed release tooling closure
alert-deliveryaos-release-alert-check.timerweekly14 daysthe [alert] section
authority-recoveryoperatorquarterly90 daysthe plan's signer roster
hub-restoreoperatorquarterly, and before a risky schema or storage migration90 daysthe production surface identity or Hub schema
key-rotationoperatorquarterly90 daysthe signer roster or production surface identity

Only andyl/main production destinations require fitness today. Perform the operator exercises while release mutations are paused, using an isolated restore/test environment. Then record the result:

aos maintain release fitness run hub-restore --report /srv/aos-release/restricted/hub-restore-2026-09-14.json
aos maintain release fitness status

Without --report, fitness run reads the report from standard input. The report is an aos.release.fitness-report/v1 document stating the performed time, each of the kind's checks with its result and detail, and the operator. Keep it in restricted storage; the attestation carries only its digest. If the command rejects a report, fix the exercise, not the report.

  • Storage restore (automated). The weekly restore check restores the independent encrypted backup into a clean directory, verifies the retained bundles offline, and records the attestation. To run it on demand:

    systemctl start aos-release-backup.service
    systemctl start aos-release-restore-check.service
    systemctl show aos-release-backup.service aos-release-restore-check.service \
      -p Result -p ExecMainStatus
    aos maintain release fitness status
    

    Check when: the backup is held independently of the maintainer machine, both jobs report Result=success and ExecMainStatus=0, and fitness status shows a fresh storage-restore bound to the installed tooling closure. A successful backup upload alone is insufficient.

  • Alert delivery (automated). The weekly alert check triggers the alert path with a synthetic unit name and records the attestation after the on-call maintainer acknowledges it.

    Check when: the acknowledgment is recorded, the message contains no secret material, and fitness status shows a fresh alert-delivery. A log entry without delivered notification is a failure.

  • Recover and verify the signing authorities (quarterly). Restore the encrypted authority backup into the isolated environment using the secret store's recovery procedure. For every role in the signer roster, compare its recovered public identity with the roster, sign a non-public test payload, and verify with the independent key. Record authority-recovery.

    Check when: every role is recoverable, each test signature verifies, and the attestation's signer-roster binding matches the current roster. Never record private key bytes in the report or public evidence.

  • Recover each production surface into isolation (quarterly). For a Hub surface, follow capture a recovery point and the isolated restore procedure, including portable database export/import; an in-place PITR bookmark cannot satisfy that check. For a static surface, restore its object set and channel generation records into an isolated origin. Check registry generations, object inventories, and anonymous package/image/container reads in the restored copy. Record hub-restore.

    Check when: the recovered copy serves the expected bytes and state, object/row comparisons reconcile, and the attestation binds the production surface identity and schema.

  • Test key rotation and interrupted publication (quarterly). In the isolated environment, follow the experimental rotation procedure or main key policy. Verify that a clean client starting with the old anchor accepts the legitimate successor and rejects an unauthorized replacement. Interrupt publication before and after commit; verify retry or a new corrective release gives the intended public result. Record key-rotation.

    Check when: trust continuity and rejection both work, each interrupted publication has one known final state with matching bytes and generation, and the attestation binds the current roster and production surface.

#If a step fails or is interrupted

Stop the next publication or channel change. Preserve the command, logs, work directory, and failed-attempt directories. Run aos maintain release status and record the global and per-destination states. If a network operation may have committed, inspect the live surface and receipts before retrying; a local timeout does not establish that the public operation failed.

Resume only when recorded and live state agree and the same inputs still apply. advance is idempotent: it skips steps whose outputs exist and whose journal state matches, and refuses to continue past a disagreement. Never delete evidence to force a retry or edit signed artifacts to make a check pass. Changed source, artifacts, or policy need a new release. After public discovery changes, publish a reviewed corrective release using the registry runbook. A failure on one destination does not undo another destination's admission. A experimental root reset is a separate operation, not an automatic response to a failed release.